STMicroelectronics on the Agrate Brianza 300mm fab, beyond the 2027 target, stated 2025-04-10. One statement, with the wording it was made in. Nothing here is computed and nothing is added to anything else.

01

What was stated

planned modular expansions increasing capacity up to 14,000 wpw

Issued 2025-04-10 by STMicroelectronics · STMicroelectronics details company-wide program to reshape manufacturing footprint and resize global cost base, 10 April 2025

A planned figure: capacity the publisher said the site is expected to reach. A promise and a measurement are different facts and this record never puts them in one column.

upper bound The publisher stated a ceiling, not a figure.

Wafer basis: 300mm actual. Two figures on different bases are 2.25 times apart before anything real has changed, which is why no figure here is shown without one.

"Up to" is a CEILING and takes bound: upper, which is the opposite direction from the Kumamoto entry's "more than". Two entries for one fab from one release, because a 2027 target and an eventual ceiling are two different statements and collapsing them would lose which is which. Read from the GlobeNewswire distribution of the same release, because ST's own page for it renders its body with a script and returns only navigation to a plain fetch: https://www.globenewswire.com/news-release/2025/04/10/3059167/0/en/STMicroelectronics-details-company-wide-program-to-reshape-manufacturing-footprint-and-resize-global-cost-base.html

02

What this figure covers

Publishers state capacity at whatever level suits them: a phase, a site, a joint venture, a company. This one covers the sites below and no others.

The Agrate Brianza 300mm fab, beyond the 2027 target

FabSiteCountryStatus
Agrate Brianza fabAgrate BrianzaIToperating

This figure is never added to another. This record holds a capacity statement for 2 of the 4 STMicroelectronics sites it lists, so a sum of what is here would be a company total built from an incomplete set and published by nobody.

03

Everything stated about this site

2 statements, oldest first. A later figure never overwrites an earlier one here, so what was said before is still readable, with its date.

IssuedAs publishedKindSource
2025-04-10planned modular expansions increasing capacity up to 14,000 wpw
upper bound
plannedthis statementSTMicroelectronics details company-wide program to reshape manufacturing footprint and resize global cost base, 10 April 2025
2025-04-10double its current capacity to 4,000 wafers per week (wpw) by 2027plannedopenSTMicroelectronics details company-wide program to reshape manufacturing footprint and resize global cost base, 10 April 2025
04

Cite this

The figure in the publisher's own words, what it covers, the basis it is counted on, and the source. A capacity figure quoted without its basis or its coverage is the failure this block exists to prevent.

For a memo

STMicroelectronics, planned capacity, the Agrate Brianza 300mm fab, beyond the 2027 target: planned modular expansions increasing capacity up to 14,000 wpw, issued 2025-04-10 (stated as an upper bound), on a 300mm actual wafer basis. Source: STMicroelectronics details company-wide program to reshape manufacturing footprint and resize global cost base, 10 April 2025, https://newsroom.st.com/media-center/press-item.html/c3330.html. Recorded by Silicon Almanac, which keeps every statement made about this site: https://siliconalmanac.com/figure/fab-capacity/stmicro-agrate-2025-04-ceiling/  

Everything in one paragraph. There is no earlier statement about this site to carry.

For the bottom of a slide

Source: STMicroelectronics (2025-04-10), STMicroelectronics details company-wide program to reshape manufacturing footprint and resize global cost base, 10 April 2025. Figure as published is stated as an upper bound. Wafer basis: 300mm actual. Statement history: https://siliconalmanac.com/figure/fab-capacity/stmicro-agrate-2025-04-ceiling/  

One line. The value is deliberately not repeated here: on a slide the number is on the slide, and a footnote that restates it is one edit away from disagreeing with it.

For a spreadsheet

publisher	covers	kind	value_as_published	wafer_basis	issued	qualifiers	source_title	source_url	previous_value	previous_issued	figure_page	retrieved
STMicroelectronics	The Agrate Brianza 300mm fab, beyond the 2027 target	planned	planned modular expansions increasing capacity up to 14,000 wpw	300mm actual	2025-04-10	stated as an upper bound	STMicroelectronics details company-wide program to reshape manufacturing footprint and resize global cost base, 10 April 2025	https://newsroom.st.com/media-center/press-item.html/c3330.html			https://siliconalmanac.com/figure/fab-capacity/stmicro-agrate-2025-04-ceiling/	

Two lines, tab separated: the headings and one row. The wafer basis and the qualifiers are columns rather than notes, so a row pasted into a model carries them where the model can see them.

05

Elsewhere in this record

No values here, only where to find them. Two capacity figures side by side is a comparison, and these are not comparable unless they share a wafer basis.

STMicroelectronics · Every fab site in the record

Other sites with a stated capacity: The Kumamoto site as a whole, both fabs together · The planned Dresden fab, as described when the joint venture was established · The Dresden fab, restated at groundbreaking · The Crolles 300mm fab · The Crolles 300mm fab, beyond the 2027 target · The Sherman, Texas site as the award describes it, across the fabs it funds · The Bloomington, Minnesota fab · The Bloomington, Minnesota fab

← The fab map and every site in the record