Pyeongtaek P5
Samsung Electronics, Pyeongtaek, South Korea. Every field this record holds on the site, its note and every source, as the row states them.
The row
- Operator
- Samsung Electronics · company page: Samsung Electronics
- Site
- Pyeongtaek P5
- Location
- Pyeongtaek, South Korea
- Type
- memory
- Status
- construction
- Wafer
- 300 mm
- Nodes
- not recorded
- First output
- not recorded
- Announced investment
- not recorded
- Map position
- 37.02, 127.07, on the map
The Elec reported in 2026 that Samsung would resume construction after a pause, and Cleanroom Technology that the P5 cleanroom is being built for HBM production.
Sources
2 sources on this row, in the order the row lists them. The order carries no weight.
Samsung to resume construction of P5 fab next month - The Elec · thelec.net
Samsung speeds up construction of P5 cleanroom for HBM production - Cleanroom Technology · cleanroomtechnology.com
Capacity statements
No published capacity statement names this site. Blank is unpublished, not zero.
On this record
What this record changed on this row, newest first. Each day is the day this record changed, never the day a publisher said it. Followed: status, first output year, announced investment, operator, name, site and sources.
2026-08-13 · The row entered this record, with the status construction. · Source at entry: Samsung to resume construction of P5 fab next month - The Elec · Source at entry: Samsung speeds up construction of P5 cleanroom for HBM production - Cleanroom Technology
None of the fields followed here has changed since the row entered this record on 2026-08-13.