Silicon Almanac. every figure links to its publisher The Desk  
Data · Fab

Manassas fab

Micron, Manassas, Virginia, United States. Every field this record holds on the site, its note and every source, as the row states them.

Every figure links to its publisher What changed, and when →
01

The row

Operator
Micron · company page: Micron Technology
Site
Manassas fab
Location
Manassas, Virginia, United States
Type
memory
Status
operating
Wafer
200 mm
Nodes
1-alpha DRAM
First output
2026
Announced investment
USD 2.2 billion
Map position
38.75, -77.48, on the map

Specialty DRAM fab (automotive/defence); began 1-alpha DRAM production in 2026 as part of a roughly $2.2bn expansion.

02

Sources

1 source on this row, in the order the row lists them. The order carries no weight.

Micron Advances Made-in-America Memory With Manufacturing Expansion in Virginia · investors.micron.com

03

Capacity statements

No published capacity statement names this site. Blank is unpublished, not zero.

Every site, on the map and in the table