Hiroshima Fab Expansion
Micron, Higashihiroshima, Hiroshima, Japan. Every field this record holds on the site, its note and every source, as the row states them.
Every figure links to its publisher
What changed, and when →
01
The row
- Operator
- Micron · company page: Micron Technology
- Site
- Hiroshima Fab Expansion
- Location
- Higashihiroshima, Hiroshima, Japan
- Type
- memory
- Status
- construction
- Wafer
- 300 mm
- Nodes
- 1-gamma DRAM, HBM
- First output
- not recorded
- Announced investment
- USD 9.3 billion
- Map position
- 34.4, 132.47, on the map
Groundbreaking July 2026 for expansion bringing EUV lithography to Japan for the first time; equipment move-in targeted for 2H 2028.
02
Sources
1 source on this row, in the order the row lists them. The order carries no weight.
Micron Breaks Ground on Hiroshima Fab Expansion - TrendForce · trendforce.com
03
Capacity statements
No published capacity statement names this site. Blank is unpublished, not zero.