Silicon Almanac. every figure links to its publisher The Desk  
Data · Fab

Hiroshima Fab Expansion

Micron, Higashihiroshima, Hiroshima, Japan. Every field this record holds on the site, its note and every source, as the row states them.

Every figure links to its publisher What changed, and when →
01

The row

Operator
Micron · company page: Micron Technology
Site
Hiroshima Fab Expansion
Location
Higashihiroshima, Hiroshima, Japan
Type
memory
Status
construction
Wafer
300 mm
Nodes
1-gamma DRAM, HBM
First output
not recorded
Announced investment
USD 9.3 billion
Map position
34.4, 132.47, on the map

Groundbreaking July 2026 for expansion bringing EUV lithography to Japan for the first time; equipment move-in targeted for 2H 2028.

02

Sources

1 source on this row, in the order the row lists them. The order carries no weight.

Micron Breaks Ground on Hiroshima Fab Expansion - TrendForce · trendforce.com

03

Capacity statements

No published capacity statement names this site. Blank is unpublished, not zero.

Every site, on the map and in the table