Kumamoto Fab 2

JASM (TSMC / Sony / Denso / Toyota), Kikuyo, Kumamoto, Japan. Every field this record holds on the site, its note and every source, as the row states them.

Every figure links to its publisher What changed, and when →
01

The row

Operator
JASM (TSMC / Sony / Denso / Toyota) · company page: Sony Semiconductor Solutions, Taiwan Semiconductor Manufacturing Company
Site
Kumamoto Fab 2
Location
Kikuyo, Kumamoto, Japan
Type
logic
Status
construction
Wafer
300 mm
Nodes
6nm, 4nm
First output
not recorded
Announced investment
not recorded
Map position
32.9, 130.82, on the map

Under construction. Tom's Hardware reported TSMC considering 4nm capability for this fab, and Notebookcheck reported completion moving to 2029. Operator string normalised 17 Aug 2026: this row read "JASM (TSMC)" while Fab 1 at the same site read "JASM (TSMC / Sony / Denso / Toyota)". One joint venture spelled two ways, so Fab 2 resolved to TSMC alone and did not appear on Sony's page and from the shared-site marking on the capacity statement that covers both fabs.

02

Sources

2 sources on this row, in the order the row lists them. The order carries no weight.

TSMC ponders upgrading 2nd Japan fab to 4nm - Tom's Hardware · tomshardware.com

TSMC's second Kumamoto fab reportedly slips to 2029 - Notebookcheck · notebookcheck.net

03

Capacity statements

Each links to its own page, with the wording, the wafer basis and the sites it covers. They are never added together.

2024-02-06 · TSMC · planned, lower bound · the statement and what it covers

04

On this record

What this record changed on this row, newest first. Each day is the day this record changed, never the day a publisher said it. Followed: status, first output year, announced investment, operator, name, site and sources.

2026-08-17 · This record changed the operator from JASM (TSMC) to JASM (TSMC / Sony / Denso / Toyota).

2026-08-13 · The row entered this record, with the status construction. · Source at entry: TSMC ponders upgrading 2nd Japan fab to 4nm - Tom's Hardware · Source at entry: TSMC's second Kumamoto fab reportedly slips to 2029 - Notebookcheck

Every site, on the map and in the table