Research Triangle Park fab
MACOM (formerly Wolfspeed), Research Triangle Park, North Carolina, United States. Every field this record holds on the site, its note and every source, as the row states them.
The row
- Operator
- MACOM (formerly Wolfspeed)
- Site
- Research Triangle Park fab
- Location
- Research Triangle Park, North Carolina, United States
- Type
- compound
- Status
- operating
- Wafer
- 100 mm
- Nodes
- not recorded
- First output
- not recorded
- Announced investment
- not recorded
- Map position
- 35.9, -78.85, on the map
GaN HEMT RF IC fab. MACOM assumed control of this 100mm GaN wafer fab on 25 July 2025, under its purchase of Wolfspeed's RF business; both companies' 10-Ks state it. Operator corrected and wafer size added 1 October 2026.
Sources
3 sources on this row, in the order the row lists them. The order carries no weight.
List of semiconductor fabrication plants - Wikipedia · en.wikipedia.org
Wolfspeed Form 10-K, fiscal year ended 28 June 2026 · sec.gov
MACOM Technology Solutions Form 10-K, fiscal year ended 3 October 2025 · sec.gov
Capacity statements
No published capacity statement names this site. Blank is unpublished, not zero.
On this record
What this record changed on this row, newest first. Each day is the day this record changed, never the day a publisher said it. Followed: status, first output year, announced investment, operator, name, site and sources.
2026-10-01 · This record changed the operator from Wolfspeed (formerly Cree) to MACOM (formerly Wolfspeed). · Source added: Wolfspeed Form 10-K, fiscal year ended 28 June 2026 · Source added: MACOM Technology Solutions Form 10-K, fiscal year ended 3 October 2025
2026-08-13 · The row entered this record, with the status operating. · Source at entry: List of semiconductor fabrication plants - Wikipedia