Dholera Fab
Tata Electronics, Dholera, Gujarat, India. Every field this record holds on the site, its note and every source, as the row states them.
The row
- Operator
- Tata Electronics
- Site
- Dholera Fab
- Location
- Dholera, Gujarat, India
- Type
- foundry
- Status
- operating
- Wafer
- 300 mm
- Nodes
- 90nm
- First output
- 2026
- Announced investment
- USD 11 billion
- Map position
- 22.25, 72.19, on the map
India's first commercial fab (built with PSMC process technology and an ASML equipment partnership); reportedly began production in mid-2026 at 90nm, two nodes behind the initially planned technology, with further node ramp expected over time.
Sources
2 sources on this row, in the order the row lists them. The order carries no weight.
India's First Chip Fab Opens at 90nm, Two Process Nodes Below What Tata Promised - Tech Times · techtimes.com
ASML to equip India's first commercial chip fab - $11 billion Dholera project - Tom's Hardware · tomshardware.com
Capacity statements
No published capacity statement names this site. Blank is unpublished, not zero.