Silicon Almanac. Search Calendar Your desk
Fabs · Fab

Dholera Fab

Tata Electronics, Dholera, Gujarat, India. Every field this record holds on the site, its note and every source, as the row states them.

Every figure links to its publisher What changed, and when →
01

The row

Operator
Tata Electronics
Site
Dholera Fab
Location
Dholera, Gujarat, India
Type
foundry
Status
operating
Wafer
300 mm
Nodes
90nm
First output
2026
Announced investment
USD 11 billion
Map position
22.25, 72.19, on the map

Built with PSMC process technology and an ASML equipment partnership; Tom's Hardware calls it India's first commercial chip fab. Tech Times reported its opening in mid-2026 at 90nm, 'two process nodes below what Tata promised'.

02

Sources

2 sources on this row, in the order the row lists them. The order carries no weight.

India's First Chip Fab Opens at 90nm, Two Process Nodes Below What Tata Promised - Tech Times · techtimes.com

ASML to equip India's first commercial chip fab - $11 billion Dholera project - Tom's Hardware · tomshardware.com

03

Capacity statements

No published capacity statement names this site. Blank is unpublished, not zero.

04

On this record

What this record changed on this row, newest first. Each day is the day this record changed, never the day a publisher said it. Followed: status, first output year, announced investment, operator, name, site and sources.

2026-08-13 · The row entered this record, with the status operating. · Source at entry: India's First Chip Fab Opens at 90nm, Two Process Nodes Below What Tata Promised - Tech Times · Source at entry: ASML to equip India's first commercial chip fab - $11 billion Dholera project - Tom's Hardware

None of the fields followed here has changed since the row entered this record on 2026-08-13.

Every site, on the map and in the table