Fab 34
Intel, Leixlip, County Kildare, Ireland. Every field this record holds on the site, its note and every source, as the row states them.
The row
- Operator
- Intel · company page: Intel
- Site
- Fab 34
- Location
- Leixlip, County Kildare, Ireland
- Type
- logic
- Status
- operating
- Wafer
- 300 mm
- Nodes
- Intel 4, Intel 3
- First output
- 2023
- Announced investment
- not recorded
- Map position
- 53.37, -6.5, on the map
Intel began high-volume production of Intel 4 here in 2023. TrendForce reported in July 2026 a further roughly EUR5bn expansion to add Intel 3 capacity. This record holds no dollar figure for the site: the amount was stated in euros, and this record does not convert currencies.
Sources
2 sources on this row, in the order the row lists them. The order carries no weight.
Intel's New Fab in Ireland Begins High-Volume Production of Intel 4 Technology - Intel Newsroom · newsroom.intel.com
Intel pours EUR5B into Ireland fab - TrendForce · trendforce.com
Capacity statements
No published capacity statement names this site. Blank is unpublished, not zero.
On this record
What this record changed on this row, newest first. Each day is the day this record changed, never the day a publisher said it. Followed: status, first output year, announced investment, operator, name, site and sources.
2026-11-10 · This record removed the announced investment, which read USD 5 billion.
2026-08-13 · The row entered this record, with the status operating. · Source at entry: Intel's New Fab in Ireland Begins High-Volume Production of Intel 4 Technology - Intel Newsroom · Source at entry: Intel pours EUR5B into Ireland fab - TrendForce