Kulim Module 2 (second construction phase)
Infineon, Kulim, Kedah, Malaysia. Every field this record holds on the site, its note and every source, as the row states them.
The row
- Operator
- Infineon · company page: Infineon Technologies
- Site
- Kulim Module 2 (second construction phase)
- Location
- Kulim, Kedah, Malaysia
- Type
- analogue-power
- Status
- paused
- Wafer
- 200 mm
- Nodes
- not recorded
- First output
- not recorded
- Announced investment
- not recorded
- Map position
- 5.37, 100.56, on the map
Second construction phase of the Kulim fab. eeNews Europe reported Infineon postponing it.
Sources
1 source on this row, in the order the row lists them. The order carries no weight.
Infineon delays Kulim fab expansion - eeNews Europe · eenewseurope.com
Capacity statements
No published capacity statement names this site. Blank is unpublished, not zero.
On this record
What this record changed on this row, newest first. Each day is the day this record changed, never the day a publisher said it. Followed: status, first output year, announced investment, operator, name, site and sources.
2026-08-13 · The row entered this record, with the status paused. · Source at entry: Infineon delays Kulim fab expansion - eeNews Europe
None of the fields followed here has changed since the row entered this record on 2026-08-13.