Silicon Almanac. every figure links to its publisher The Desk  
Data · Fab

Crolles 300mm joint fab

GlobalFoundries / STMicroelectronics (joint venture), Crolles, France. Every field this record holds on the site, its note and every source, as the row states them.

Every figure links to its publisher What changed, and when →
01

The row

Operator
GlobalFoundries / STMicroelectronics (joint venture) · company page: GlobalFoundries, STMicroelectronics
Site
Crolles 300mm joint fab
Location
Crolles, France
Type
foundry
Status
paused
Wafer
300 mm
Nodes
not recorded
First output
not recorded
Announced investment
USD 7.5 billion
Map position
45.28, 5.88, on the map

Announced 2022 with roughly EUR7.5bn investment, targeting 620,000 wafers/year by 2026; Bloomberg reported in January 2025 that construction had stalled after 18 months of slow progress.

02

Sources

1 source on this row, in the order the row lists them. The order carries no weight.

Two Semiconductor Fab Projects Abruptly Halted - TrendForce · trendforce.com

03

Capacity statements

No published capacity statement names this site. Blank is unpublished, not zero.

Every site, on the map and in the table