Silicon Almanac. Search Calendar Your desk
Fabs · Fab

Fab 1

DB HiTek, Bucheon, Gyeonggi-do, South Korea. Every field this record holds on the site, its note and every source, as the row states them.

Every figure links to its publisher What changed, and when →
01

The row

Operator
DB HiTek
Site
Fab 1
Location
Bucheon, Gyeonggi-do, South Korea
Type
foundry
Status
operating
Wafer
200 mm
Nodes
not recorded
First output
1997
Announced investment
not recorded
Map position
37.5, 126.78, on the map

Analogue and mixed-signal foundry. DB HiTek lists this fab, Fab1 on its Bucheon campus, at 0.35um to 0.15um, and states its capacity in 8-inch wafers. Wafer size added 1 October 2026.

02

Sources

3 sources on this row, in the order the row lists them. The order carries no weight.

List of semiconductor fabrication plants - Wikipedia · en.wikipedia.org

Fab & Global Network - DB HiTek · dbhitek.com

About Us - DB HiTek · dbhitek.com

03

Capacity statements

No published capacity statement names this site. Blank is unpublished, not zero.

04

On this record

What this record changed on this row, newest first. Each day is the day this record changed, never the day a publisher said it. Followed: status, first output year, announced investment, operator, name, site and sources.

2026-10-01 · This record changed the sources on the row, from 1 to 3. · Source added: Fab & Global Network - DB HiTek · Source added: About Us - DB HiTek

2026-08-13 · The row entered this record, with the status operating. · Source at entry: List of semiconductor fabrication plants - Wikipedia

Every site, on the map and in the table